REMEDY’S CAPABILITIES
R01 Modelling of High Pressure Grouted Compaction Anchors – Egan & Merrifield 1997
R02 Cost Effective Embankment Stabilisation – Egan & Snell 1998
R03 Use of Miniature EPCs in Multi-Gravity Environment- Egan & Merrifield 1998
R04 Performance of Embankment Stabilisation Measures – Egan & Rudrum 2000
R05 Earthworks Management – Egan 2005
R06 Earthworks Management – Disadvantages of blanket factor of safety design – Egan 2007
R07 The Ground: How structural engineers can manage the risk – Egan 2007
R08 CPT Testing for Design of Vibro Replacement – Egan 2008
R09 Design & Construction of High Capacity Minipiles – Egan, Bekk & Gavins 2008
R10 Observed Installation Effects of Stone Columns in Soft Clay – Egan, Scott & McCabe 2008
R11 Clients remain exposed to ground risk – Egan 2008
R12 Challenges of 3D FE Modelling of Stone Columns – McCabe, Killeen & Egan 2008
R13 Review of Performance of Stone Columns in Soft Soils – McCabe, Nimmons & Egan 2009
R14 Demonstrating Environmental Benefits of Ground Improvement – Egan & Slocombe 2010
R15 Costs, Benefits & Constraints of Ground Improvement – Slocombe & Egan 2010
R16 Settlement of Vibro Stone Columns in Compressible Soils – McCabe & Egan 2010
R17 Development of Residual Loads in DCIS Piles – Flynn, McCabe & Egan 2012
R19 Load Capacity of DCIS Piles from Installation Parameters – Egan 2013
R20 Ground Heave from Stone Column Installation – McCabe, Kamrat-Pietraszewska & Egan. 2013
R21 CPT to assess DCIS Pile Capacity – Flynn, McCabe & Egan 2014
R22 DCIS Real Time Validation – Egan 2014
R23 Design of High Performance Anchored Retaining Walls to EC7 – Egan & Mothersille 2015